Extract cleaning is the one recurring line item in a kitchen’s running cost that almost every operator still buys on price alone. It repeats every quarter or half-year for the life of the building, it is invisible when it is done badly, and the documents that prove it was done properly are rarely requested at the point of order. This is a buyer’s guide to closing that gap: what a competent contractor has to be able to show, how to turn three incompatible quotes into one comparable number, and which clauses to fix before the first van arrives.
Two Cleaning Regimes Buyers Routinely Conflate
Ask an operator what extract cleaning costs and the answer usually mixes two jobs with different intervals, different skills and completely different paperwork. The first is appliance-level servicing: baffle filters washed, canopy and plenum degreased, electrostatic cell taken out and cleaned, carbon stage assessed. That work runs weekly to quarterly and is often absorbed into a maintenance contract or handled by kitchen staff. The second is system-level cleaning: the inside of the ductwork, the vertical risers, the fan impeller and casing, and the roof terminal. That is specialist work, it is inspected in most European markets, and it is the part that carries the fire risk.
The boundary sits at the canopy-to-duct interface, and that is precisely where liability falls through. When a fire investigation or an insurance surveyor finds a grease bed above the plenum, the appliance contractor says the duct is not his scope and the duct contractor says the plenum is not hers. Both may be right on paper. The operator pays for the ambiguity twice, once in the incident and once in the premium.
A single quote claiming to cover “the whole system” without naming the riser, the fan and the terminal is not a discount. It is a scope gap that will be priced later, at the least convenient moment, usually as a variation while the van is already on site.
What TR19 Actually Requires
TR19 is the BESA specification for the internal cleanliness of ventilation systems, and the grease companion volume is the document that governs kitchen extract. It is the reference used across the UK and Irish markets and has been adopted informally well beyond them. Three parts of it matter to a buyer holding a quote.
Post-clean cleanliness in numbers, not adjectives
TR19 assesses grease deposition on duct surfaces in micrometres and evaluates it after cleaning, not before. The working thresholds are a mean deposition of no more than 200 micrometres across the sampled area, with no single point above 500 micrometres. That is a measurable standard, and it is the only part of the specification a buyer can verify without seeing the inside of the duct. For comparison, the EN 15780:2025 cleanliness grades run from low at 50 micrometres through medium at 200, normal at 500 and high at 1,000, so the post-clean target sits at the medium grade with a spike tolerance on top. Two hundred micrometres is roughly the thickness of two sheets of office paper: invisible on a black duct interior, and quite capable of sustaining a fire once it has cooked onto the metal.
Frequency set by risk, not by calendar habit
TR19 gives a risk-based table that keys cleaning interval to fuel type and hours of cooking per day. A charcoal or solid-fuel cookline running twelve to sixteen hours a day lands in the three-month band; a gas cookline at six to twelve hours typically falls to six months; lighter use moves to twelve. NFPA 96 uses the same logic with different bands, and most insurers in either jurisdiction follow the local table rather than inventing their own. The table is a starting point, not a substitute for measurement: a site that measures 480 micrometres at six months is not compliant at six months regardless of what the table says.
Competence, method and the paper behind them
The specification expects operatives trained and certified to the scheme, a method statement written for the actual system, a COSHH assessment for the chemicals used, a hot work permit wherever cutting or drilling happens, suitable access equipment, containment so that grease and water do not end up in a live kitchen, and a post-clean verification report. Six items, all cheap to produce when the contractor is competent and all expensive to fake.
Five Documents to Demand Before You Award
Competence evidence. Not a company logo on a certificate, but the operative names, the scheme, and the expiry date. Certification that lapsed last year is worse than none, because it signals the contractor is not tracking his own compliance.
A method statement for your system. A generic two-page document that mentions no riser, no roof access and no fan is a document written for a tender, not for a job. Ask what happens at the change of direction above the second floor and watch whether the answer is specific.
A sample verification report from a comparable system. Comparable means similar height, similar fuel, similar duct size. Read the readings column. A report with photographs but no micron figures is a receipt, not a verification.
Insurance in writing. Public liability at a level that would survive a kitchen fire claim, employers liability, and explicit confirmation that hot work is covered. A surprising number of small extract cleaning firms carry cover that excludes cutting and welding.
Two references you can actually call. One should be a system like yours. The question worth asking is not whether the contractor was good but whether the verification report was accepted first time by the insurer or the fire officer.
Weak evidence looks consistent across markets: a certificate for a different scope, a report whose photographs are undated, a method statement that references a different building, and an insurance schedule that arrives after the order is placed.
Reading the Quote: The Line Items That Decide the Price
Extract cleaning prices are not comparable unless they are broken down, because the same headline figure can describe three different scopes. A quote worth comparing itemises:
Lineal metres of horizontal duct, banded by size, because 400 mm and 900 mm duct are not the same job at the same rate. Vertical riser metres, which carry the access cost. Access panels already present versus panels to be fitted, since fitting means cutting, fire-stopping, re-insulation and making good. Canopy and plenum, usually priced per bay or per square metre of internal surface. The fan unit, where the impeller normally has to come out. The discharge terminal. Waste removal with a transfer note, because grease is controlled waste in every European jurisdiction and disposal is a real cost. Out-of-hours working, since most of this work happens after closing. And the verification report, which some contractors treat as a free appendix and others price as a deliverable.
Ask for a schedule of rates as well as a lump sum, and ask for the quantities to be taken off a drawing or a site survey rather than estimated from the car park. With rates and quantities in hand, two quotes become comparable in ten minutes; without them, the only comparison available is the total, which is the number least related to work done.
Normalising Three Quotes: A Worked Example
Take a mid-size installation: a 2.2 m heavy cookline canopy, 5,000 cubic metres per hour at the hood, a 450 mm main, 18 m of horizontal duct, a 6 m vertical riser to a third-floor roof, eight access panels already in place, and a roof-mounted centrifugal fan. The system moves 1.39 cubic metres per second, which in a 450 mm duct is 8.7 m/s, a normal transport velocity for grease.
Quote A is a lump sum covering the canopy, the horizontal duct and four new panels, with the report included, and excludes the riser and the fan. Quote B prices all 24 m at a rate per metre, prices panels separately, includes the fan and excludes the report. Quote C is the cheapest by a wide margin and covers the horizontal duct only, with no panels and no report.
Put all three on the same scope. Quote A needs the riser length and the fan added at typical schedule rates, which moves its headline to roughly 1.4 to 1.5 times. Quote B needs the report and the panels added, which moves it to about 1.2. Quote C needs the riser, the fan, four panels and the report, which takes it to something like 1.9 to 2.2 times its headline, so the cheap quote becomes the expensive one by the time anyone can compare it. This inversion is not a trick of this example; it is the normal outcome whenever the schedule of rates is left out.
Two further adjustments belong in the comparison. Out-of-hours premium typically runs 20 to 40 per cent depending on the market and the notice given, so a quote priced for day work is not the same offer as one priced for nights. And access panels retrofitted after the fact commonly cost two to four times what they cost at construction, because the work now includes fire-stopping, insulation repair and often a scaffold.
What the Verification Report Must Contain
The report is the only durable output of the visit, and it is the document an insurer, a fire officer or a purchaser’s surveyor will ask for two years later. It should name the system and reference a drawing. It should number every access point and pair a before and after photograph with each. It should give deposition readings in micrometres per location, with the method stated. It should say what proportion of the internal surface was sampled. It must state, explicitly, which sections were not accessed and why, because “not accessed” is legitimate when it is declared and fraudulent when it is silent. It should reference the waste transfer note. And it should carry a signature and a company name that match the order.
Rejection conditions are worth agreeing in advance: readings absent, photographs undated, more than a stated percentage of the system unaccessed without prior agreement, or a mean above 200 micrometres. A contractor who will not accept a return visit at his own cost against those conditions is telling you what he expects his own work to look like.
Programme, Hygiene and Fire Safety During the Works
A single-kitchen system typically takes one to two nights; a multi-riser building with roof plant takes three to five. During that window the kitchen may still trade if the canopy work is phased and the duct isolation is complete, which is why the programme belongs in the quote rather than in the first site conversation.
Three permits govern the visit: fire alarm impairment, hot work, and isolation of the extract fan so it cannot start while an operative is inside the duct. Food hygiene needs covers, screens and a clean-down afterwards, framed under the usual food safety obligations of Regulation 852/2004 Annex II rather than left to the contractor’s judgement. Containment matters more than most quotes admit: a grease and water mix travelling down a riser finds every unsealed penetration in the building.
Six Failure Modes That Repeat Every Year
Cleaning judged by looking at the canopy, which is the one surface the kitchen staff already keep clean. No baseline measurement, so no improvement can be demonstrated and no frequency can be justified. Access panels priced as extras once the van is on site and the kitchen is closed, which is the moment the buyer has least leverage. Frequency set by calendar rather than by measured deposition, which over-cleans a light kitchen and under-cleans a charcoal grill. A verification report that is unsigned or carries no readings, which is unusable exactly when it is needed. And the commonest of all: the fire officer or the underwriter asks for the last two reports and neither exists.
Eight Clauses Worth Writing Into the Order
Access panels provided as part of the ductwork scope at construction, with positions agreed against the drawing before the duct is insulated. The verification report named as a condition of final payment, not a courtesy. A defined reject standard with a return visit inside ten working days at the contractor’s cost. A frequency review at every visit, against measured deposition rather than calendar. Waste transfer documentation for every load. Insurance levels stated as numbers with hot work named. Out-of-hours rates fixed for twelve months so the second visit is not a negotiation. And the fan and terminal named in scope in so many words, because that is where the quiet exclusions live.
Design Decisions That Change the Annual Cost
Once a buyer has normalised two or three quotes, the more useful question becomes why the number is what it is. Four design decisions move it.
Access provision. A panel at every change of direction, at intervals along long straight runs, and within reach of a platform or a ladder rather than in the middle of a ceiling void. This is the single cheapest intervention available, and it is only cheap before the duct is closed up.
Routing and geometry. Every mitred bend collects grease. Long-radius bends and fewer direction changes reduce both the deposit and the time needed to remove it, which is the same statement as reducing the annual invoice.
Duct velocity. Grease has to keep moving. The 1.39 cubic metres per second in the example runs at 8.7 m/s in a 450 mm duct, 11.1 m/s in a 400 mm duct and 7.1 m/s in a 500 mm duct. The first is comfortable, the second is noisy and costly in pressure, the third drops toward the range where grease settles on horizontal runs. Sizing for the middle of the transport window is cheaper over ten years than sizing for the lowest first cost.
Pressure budget. For the same system, the resistance stack runs roughly 40 Pa at the entry, 140 at the canopy filters, 180 across the duct and bends, 60 at the fan inlet, 40 at the terminal and 30 in the balance allowance, so around 490 Pa before the system-effect margin, which at 12 per cent gives 550 Pa and a fan selected at 600. Shaft power is 1.39 times 600 divided by an efficiency of about 0.62, so roughly 1.35 kW and a 1.5 kW motor with a modest margin. Under-sizing the fan to save first cost is how a system ends up running at the edge of its curve with a fouled duct, which is where the airflow complaints start.
The most effective way to reduce an extract cleaning bill is to remove the duct. A recirculating system has no riser, no roof terminal and no duct interior to verify, so the recurring cost moves from a specialist subcontractor to a filter, cell and carbon routine the site can schedule itself.
How This Changes What You Buy
Where the building cannot take a duct, or where the roof rights will not be granted, a ductless hood pairing a multi-stage electrostatic cell with a carbon odour stage replaces the whole cleaning regime with an appliance routine: filters weekly, cell on a documented cycle, carbon replaced on measured breakthrough. Contact time on the odour stage is the number that decides performance, and it sits in the 0.2 to 0.6 second band for most cooking loads. The ductless range hood family is built around exactly that routine, and it is the reason a site with no riser can still produce a maintenance record. Where headroom is the constraint rather than the roof, a floor-standing cabinet of around 520 mm width decouples purification from the canopy and still leaves the site with an appliance routine instead of a duct contract.
Where the volume is genuinely high, the ductwork exists and the building has a real cleaning programme with reports to prove it, a ducted electrostatic precipitator ahead of a centrifugal fan remains the correct architecture, and the cleaning cost simply becomes part of the calculation: the ducted ESP filter range covers that high-volume end. The ND-series covers heavy cooklines, the N-series the lighter fry and griddle work, and an Odor Removal Tower adds the gas-phase stage where neighbours or a dining room are close. Where there is no fixed cookline at all, the mobile catering cart range carries the same recirculating logic to markets, pop-ups and front-of-house live cooking. The point of the specification work above is not to choose a product; it is to know what the system will cost to own before the order is signed, and to buy the architecture that keeps that number visible.